Camberwell Works
Saturday, 13 SEPT 97 at Camberwell, the workmen are busy on trackwork
at the down end of the yard. The UP track and the points leading to the
former No. 1 and No. 2 sidings at CWL has been lifted and it appears new
track will be laid.
As a result, down trains are using the DOWN line from BLY to BOX and up
trains are using the CENTRE line from BOX to BLY. The Alamein shuttles I
presume are running via the overpass and shunting to the down siding to
reverse, or are they replaced by buses??
Regards
Steven Haby