>CityRail's On Time Running for this morning's peak:
>
>Suburban: 94.54% (within 3 minutes)
>Intercity: 100% (within 5 minutes)
>
>
>For the suburban system, only 2.55 trains need to run late to lose 1%
>of the on time running. For the afternnon peak, only 1.94 trains need
>to run late.
Just as a matter of interest, does the "On Time Running" figure
include the time points missed by cancelled or short worked trains, or
are those time points just quietly dropped from the target?
Cheers,
Bill
Bill Bolton billbolton@onaustralia.com.au
Sydney, Australia