[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Some good news.





Maurie Daly <mauried@commslab.gov.au> wrote in article
<mauried.409.34A47B33@commslab.gov.au>...
> Noticed on my annual Xmas pilgramige down to Melb for Xmas dinner that
there 
> is some progress on fixing up the main southern line.
> Wagga loop is being extended to approx 1400 metres from its current 900.
> The extension is at the Junee end with the new loop starting immediately
after 
> the Wagga Viaduct has finished.
> Sadly this was the only sign of any improvements between Junee & Melb
even 
> though a number of the other loops are earmarked for improvement as well.
> Also noticed on the VIC side that some of the signal gantries over the SG
line 
> have been removed and replaced with signals on posts on the side of the
line 
> although there doesnt seem to be any logic to it.
> Glenrowan and Longwood loops are 2 examples.

Now if they would only improve the standard of the track so that the
Xpensive Political Toy can do 160km/h in Victoria!

> 
> cheers
> MD
> 
> 
> --------------------------------------------------
> Maurie Daly
> Department of Communications Lab.
> Canberra
> Australia
> mauried@commslab.gov.au
> ph 6 2791331
> --------------------------------------------------
>