[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Lilydale to Yarra Glen



Thomson Family (thomson@bigpond.net.au) wrote:
> > As an aside to this, Connex are investigating the reopening of the line
> beyond Lilydale to Yarra Glen as they believe it has very
> > good potential.
> >
> Really?? This is not in their contract! I find this hard to believe, it
> would cost a fair bit to restore all those bridges. How far are they into
> their feasability studies?

Coldstream electrification was proposed on and off ever since the line
closed, at least during the whole time I was living in Mooroolbark. It was
taken about as seriously as Electiondale.

Cheers
David