[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: [Another] Alice-Darwin rail link delay
keith malcolm wrote:
> >
> > I'd guess Train Order working. Unless by the time it actually
> > gets built the ARTC has a wizzo 'next generation' system, in which
> > case you'd probably use that.
> >
ARTC are controlling to Alice Springs under contract to ASR - ARG - G&W
(whatever they are called) who own the line.
ARG (G&W) will eventually control the line.
>
> Maybe the NSW train order system will have been sorted out, and it will have
> become a national standard.
>
Much more likely to be the SAR / CR system inherited by the line
operators ARG (G&W) (if it is built that is:))
Neil Waller