[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [NSW]Short cuts



"Dave Proctor" <david@spambait.proctor.net> wrote in message
hA9G6.11668$Xl3.721615@news2.aus1.giganews.com">news:hA9G6.11668$Xl3.721615@news2.aus1.giganews.com...
| "Mr BGR" <bigguy147@hotmail.com> wrote in message
|
| > BTW, the
| > rumour is rubbish but now you have told the world it well become true!
In
| > addition, there has never been a problem with swaps due to the nature of
| > shiftwork and the effects on social/ family needs of workers.
|
| There has been some problems, mainly due to minimum times between shifts
and
| the necessity to maintain road knowledge. For example, if a driver based
at
| Waterfall consistently swapped all shifts involving running to Richmond,
to
| the extent that his/her road knowledge was lost, then that would be an
| operational difficulty.

Not if he keeps swapping :-)


| But I agree that if the two shifts are in the normal area of operations
for
| a depot, and as long as minimum times between shifts are maintained, then
| there should not be a problem.

Usually the whole week is swapped, so usually, no problems.