[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [NSW] Darling Harbour Line



Leighton Contractors have built site huts over the line for the ABC
extension. I have noticed a water tank disassembled near the Powerhouse. (Is
that the one from Clyde Workshops?). I assume it will provide watering
facilities for any visiting steam locomotive.

Chris

"Werris Creek" <werriscreek@bigpond.com.au> wrote in message
fCNB6.2474$482.12905@newsfeeds.bigpond.com">news:fCNB6.2474$482.12905@newsfeeds.bigpond.com...
> Track access to Powerhouse is to be restored with new track in concrete
and
> prettied up as the area will be public open space.
>
> Regards
>
> Werris
>
> Ronald BESDANSKY wrote in message
> <6UMB6.2444$482.12590@newsfeeds.bigpond.com>...
> >Yet another change to this line - all track has been lifted between the
> >Darling Harbour end of the Railway Square tunnel/overbridge and the
Sydney
> >Yard end of the Ultimo Road underbridge. A structure has been constructed
> >above the right-of-way to carry temporary builder's cabins during the
> >construction of (I presume) the extensions to the ABC offices. Does
anybody
> >know if it is intended to re-instate the track? Presumably, its only
> >function is rail access to the Powerhouse Museum.
> >
> >
>
>