[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Hunter Valley Happenings



Chris Stratton (stratton.chris.cp@NOSPAMbhp.com) wrote:
> The Maldon-Dombarton line was going to be 25kVAC electrified. The changeover
> point at the Wollongong end was going to be on the flat at American Creek
> which is between Coniston and Unanderra.

On this note, were all 86s built with provision for dual voltage or just
8650? The 86s were being designed at the same time as 25kV electrification
to Melbourne was proposed.

Cheers
David