[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Sydney Airport open day/railway opening




> It would appear that the first passenger trains are after 09:30ish.

I think the 8 car S-set will be first normal train to use the Up Airport
Line at 09:37 at Turella (after the opening G-set)

> The official opening train appears to be an 8 car G set departing Central
07:03,
> terminating at Turella then doing a promotional run stopping at all the
stations
> as required on the up.

There is normal 8 car S-set leaving approx 06:56 at Central (to the Airport
Line). I don't know if that train will carry passengers to through the link
or if they carry passengers, will they allowed to alight at one on the
Airport Link Stations in order to see the G-set opening? Or will this train
give way to the G-set? - as they stated it will run as tabled to Turella
before running empty to Campbelltown - so basically it could be the 'first'
train before the opening G-set.

--
--------------------------------------
Danny Mok
forghia@ozemail.com.au