[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[QLD] 3'6" siding removed at Salisbury



During the week, I noticed that the 3'6" former Comeng siding at
Salisbury (near Nyanda) has been removed.  Except for the Railway PDE
level crossing, the rails have been removed back toward Rocklea, just
beyond the point where the overhead wiring finishes. (Why was the first
section of this siding wired anyway?).  On the other side of Railway
PDE, all traces of the 3'6" have been removed, with the level crossing
rails dead-ending into a new area of landscaping.

The standard guage siding remains intact, and judging by the shine on
the rails may still see intermittent use.  I have no idea what this
siding is used for.

--Colin