[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

9461/9240 on Tuesday 19.10.1999.



Aus loco discussion mailing list I ran 9461/9240 on Tuesday 19.10.1999.
Sign on at 1355. Per car to North Dynon yard, relieve and un 9461 to Maryvale APM, assist unloading and re-loading, then run Light loco Maryvale APM to Hazelwood siding, form 9240 up goods via the Morwell Briquette siding to Geelong. Relieved by Dynon crew at North Dynon Yard on arrival.

9461:- Locos P 23 off line, X 33 active, A 77 active. 19 wagons, 540 metres, 785 tonnes.
Ex Dynon 1438, Flinders Street 1456, Caulfield 1512, Dandenong 1530, Pakenham 1549, Warragul 1624, Morwell 1701, Morwell Exchange sidings 1709-1721, Maryvale APM arrive 1743.

Light locos A 77-X 33-P 23 ex Maryvale APM 1832, Morwell Exchange sidings 1852-1919 (WLC), Hazelwood arrive 1924. Attach to wagons and FX1 brake test.

9240:- Locos A 77 active, X 33 active, P 23 off line with 13 wagons, 320 metres, 564 tonnes. Ex Hazelwood 1943, Morwell arrive 1949. Detach and stable load.
Run Light Locos ex Morwell 1956 to the Morwell Briquette siding arrive 2007. Attach to loading and SC continuity test.
Ex Morwell Briquette siding with 15 wagons = 1140 tonnes at 2034. Arrive Morwell at 2042. Attach briquette loading to rear of Hazelwood loading and complete MX1 brake test.
Depart Morwell A 77 active, X 33 active, P 23 active. 28 wagons, 559 metres, 1704 tonnes at 2117, Warragul 2201, Pakenham 2246, Dandenong 2309-0000 attach 10 wagons and MX2 brake test (38 wagons=688m=1964t), Caulfield 0024, Flinders Street 0051, Arrive North Dynon 0106.

Max full load for A-X-P combo with a non stop run at Hernes Oak loop is 2360 tonnes. Train was just 54 tonnes over the load for an X and A class, therefore the P was needed.
 
 

MICHAELBRAY wrote:

Aus loco discussion mailing listSince the Freight Victoria take over, the south east has been a hive of activity. This morning three freight trains passed Murrumbeena within half-an-hour. First up was G543 on the up Lyndhurst cement train with about six wagons at 03.50. A few minutes later A71-H4 passed on the down with about a 30 wagon empty log train. At 04.20 the up loaded paper train passed with A78-T374. The down paper train this afternoon due to pass Murrumbeena at around 15.00 will have P23-A77-X43. I don't normally see the night Maryvale goods, as I am at work at this time, so I can not comment on these trains. It has certainly pick up down here, with train sizes noticeably increased since the V/Line days, added to this, bigger locomotive lash-up are seen on a regular basis. The down paper train over the last month has been a three engine roster. Michael
______________________________________________________________________ To unsubscribe, write to Ausloco-unsubscribe@listbot.com Start Your Own FREE Email List at http://www.listbot.com/