[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

BHPIO Sights.



Aus loco discussion mailing list

G'day all, just a quickie from my jaunt on the 25/01/00.
BHP Iron Ore Western Australia.
 
0800 hrs, 6071, 6077, 110 cars, 6076, 110 cars, ex Yandi loaded. 54 km peg.
0940 hrs, 5655, 5661, 110 cars(empty), in the passing track at Abydos, with High Rail 9 behind it. And the Speno rail grinder in the 'back track', all crossed 5637, 5645 and 110 cars(loaded) ex Whaleback. Abydos is at 134km from Port Hedland.
The rail grinder was working the 120 km area.
1248 hrs, rail grinder again in the back track at Abydos, 5649, 5643, 110 cars, 5667, 5664 and 110 cars empty to Yandi arriving the passing track. And 5657, 5668, 110 cars loaded ex Jimblebar through on the main.
1320 hrs saw 5657, 5668, 110 cars loaded ex Jimblebar stop on the mainline at Gillam and cross 6075, 6073 110 cars empty to Newman on the passing track, then 20 minutes later the 'EPX' train rolled through with 5638, 5652, 110 cars, 5658, 5666, and 110 cars(empty).
 
All in all, a busy 5 and a half hours, with a 'triple cross' and one 'quad cross'
 
Regards,
Richard.
mailto:toad@norcom.net.au
http://www.norcom.net.au/~toad
 

To unsubscribe, write to Ausloco-unsubscribe@listbot.com
______________________________________________________________________
Get a Free PC with a 3-year subscription to The Microsoft Network
(after rebates). The new PC features a 400MHz Celeron, 32MB, 4GB, 40x
CD, 3D Graphics and a 56K modem. Come to
http://www.listbot.com/links/myfavoritepc2 for details. Act now
since this is a limited time offer!