7 car HUB set, 310 tons. Max. load up Cowan Bank 325 tons. Tabled
14 minutes. However, when electrification works were in progress, a banker
was added at HR in case the train was brought to a stand on the Bank.
Late in the 1960s a van was added to 24/71, but this was well
after Gosford electrification.
-John Lacey
Stephen Carr wrote:
Aus loco discussion mailing listHI
I was told by an old loco driver today that the Newcastle flyer (pulled by a
38) was a 8 to 10 car train. If so it would require help up Cowan bank. I
through it was a no-stop service made up of a 7 car HUD set which did't
require help. What is the largest load of a 38 with 245psi up the 1 in 50
and 1 in 40 of Cowan bank.Thank you
Stephen