Dunmore test train

Stratton, Chris CP (Stratton.Chris.CP@bhp.com.au)
Thu, 8 Apr 1999 12:52:58 +1000


This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01BE816A.5A597D70
Content-Type: text/plain;
charset="iso-8859-1"

The test train left from Dunmore about 11:30 with DL44+DL47 up front. I passed it at Croom and it was really moving along. By the time I turned around and did 120kmh along the freeway I beat it to Kembla Grange by only 3 mins. It then went around the Outer Harbour Loop, passing NB1872+4814 which were pushing a log train into the unloading siding.
Regards,
Chris.

------_=_NextPart_001_01BE816A.5A597D70
Content-Type: text/html;
charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
Dunmore test train

The test train left from Dunmore about = 11:30 with DL44+DL47 up front. I passed it at Croom and it was really = moving along. By the time I turned around and did 120kmh along the = freeway I beat it to Kembla Grange by only 3 mins. It then went around = the Outer Harbour Loop, passing NB1872+4814 which were pushing a log = train into the unloading siding.

Regards,
Chris.

------_=_NextPart_001_01BE816A.5A597D70--