[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Glenrowan



Eddie Oliver wrote:

> Rod wrote:
> >
> > Thursday 14-10-99 is set aside for testing Glenrowan, and it should then be
> > finished!
>
> For testing WHAT at Glenrowan?

Like Chiltern Loop, Glenrowan Loop has been extended at the down end to 1500m (I
think) and Rod refers to the testing of the signal circuits before commissioning.

David.