>TRACK
>EBR's track covers 134 kilometres and travels over some extremely
>mountainous terrain. It is approximately 70% steel sleepered and contains
>many large bridges constructed of permanent materials. The track is in
>similar condition to Tasrail but, unlike our track it is almost continuously
>jointed.
What does "continuously jointed" mean. Not welded?
I wonder what they will do with the locos. Include them with
Tasrail's existing fleet, or keep them captive on the (ex) EBR?
Cheers...JD
==========================================================
John Dennis jdennis@acslink.net.au
Melbourne denjo02@cai.com
Australia http://www.acslink.net.au/~jdennis
Dutton Bay Tramway pages updated 1 January
DBT URL: http://www.acslink.net.au/~jdennis/dbt.html