Re: NR at Spencer St

Chris Drymalik (gcoscpd@msgw.systems.sa.gov.au)
22 Oct 1997 00:15:17 GMT

In article <344B5A14.404260B5@ozemail.com.au>, trainman@ozemail.com.au
says...
>
>Adrian Whichello wrote:
>

>
>It will soon be hauled by NRs.
I won't bet on that. NR have apparently been speed restircted to 100kph in
South Australia by Track Access. Unless they want to slow down the Indian
Pacific rather a lot it will need to use a locomotive that can go faster.

Also yesterdays Perth bound IP left with ALF20 + ALF23 hauling. ALF20 was
supposed to go onto the coal train at Port Augusta. It was a double IP with
a power car at each end. The power car at the lead end appeared to have been
put on at short notice, as the electricians seems to be giving it a good
checking over and a fuel tanker was parked next to it filling up the cars
diesel tanks.

-- 
Chris Drymalik    I speak for myself, not my employeer.