The new yard at Camberwell is comming along now with the points at the
up exit from the yard installed last weekend the points for the yard at
the down end have be layed out on the ground and need to be connected
now. The overhead structures are going up now.

All I can see at Burnley from the Belgrave/Lylidale line is the overhead
work is almost complete with the wires going up now.

Last time I was at Bayswater(about 4 weeks ago) the foundations for the
maintence center had been poured and not much had been done. I have a