Re: When does GSR start running the Overland?
David Bromage (dbromage@metz.une.edu.au)
14 Oct 1997 01:20:59 GMT
Krel (krel4203@netconnect.com.au) wrote:
>AFAIK November 1st is the date for the GSR takeover. Fares and timetable
>stay for two years. Motive power and crewing is still under negotiation but
>I believe it boils down to V/Line Freight or NRC (with NR class locos).
And another point which I raised in another thread. If V/Line Freight are
going to be providing motive power and crews for passenger trains then why
did they bother with the passenger/freight partition?
Cheers
David