Work is very much underway of a steam hauled (R711) day-return service
on Saturday's - the evening up will most probably be to a Sunday
timetable (details are being worked out). No balancing movement as yet
- it appears at this stage that the cars will be dribbled back to
Warrnambool one at a time or so through the week.
As for Moriac - I'd say buckley's of that. Not much patronage, the
difficulty of stopping there (you'd lose quite a bit of time due to the
grade of the location) and i'd think it's not justified. But stranger
things have happened!
Cheers,
Craig.
-- Craig Haber albatross@harnessnet.com.au Manufacturing Systems Engineer (almost) Web Page Designer, Harness Racing, Railways, and Essendon Football Club fanatic http://www.harnessnet.com.au/