[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Re: [QLD] Electrics (was diesels) on Airport Line
The Airport Line traction overhead was energised on Tuesday afternoon
13/2/2001 and apparently the QR track geometry train has already been down
the line.
The first "electric train" is scheduled to run some time this coming Sunday
night 18/02/2001.
Exact time of run is unknown.
Now that the traction overhead is energised, only authorised (yellow card)
personnel are permitted line side.
John Lambert.