[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Echuca-Toolamba



Was up Echuca way last weekend and returned home via Shepparton so I thought I would check out the state of the line so we stopped
at Kyabram. the platform remains at Kyabram although fairly overgrown and a tree is growing over onto the permanent way in such a
way that a train would have a problem getting through.

All home signals (light) are lit and  two of them are very bright, (can be seen a long way away), the other one is very dull and can
only be seen if you look directly at it, all level crossings are covered in dirt from passing traffic and the rails are very rusty,
nothing has been this way for quite a while. Which prompts me to ask what is the current status of this line and what (if anything)
is planned to be done with it, also, what was the last rail movement over this section of track.

Regards Michael