> 25 cars would be around the 1250 tonne mark , getting close to a full > load for an NR (1400 tonnes up 1:45) , but well within its ratings. > It would lose a bit of time in the Hills but nothing like 4 hours. > MD Late departure from SSS and problem with a fail freight train at Manor loop(near Werribee) contributed to the problem. Cheers James