[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
Insulated Rail Joints.
- Subject: Insulated Rail Joints.
- From: "Tony Gatt" <baulko@tig.com.au>
- Date: Sat, 9 Sep 2000 13:29:42 +1000
- Newsgroups: aus.rail
- Organization: The Internet Group (Sydney)
- Xref: bclass.spectrum.com.au aus.rail:18165
After an early morning trip to Campbelltown, and a little inspection of
Platform 4, I noticed that Platform 4 now has track circuiting.
I understand the reasoning for that, however...
What I don't understand, is that 5ft before the buffers, both rails have
Insulated plates connecting the full length of track with the last 5 ft that
stop at the big concrete block at the Up end of platform 4.
Why would the signal engineers go to the trouble of insulated joints 5 ft
before the buffers, when the track is insulated by the sleepers and a 4ft
8.5 inch "air gap" at the end of the line.. weird..
Ian, maybe you can help..
--
Thanks,
Tony Gatt.
-----------------------------------------------------------------
http://homepages.tig.com.au/~baulko/
or
http://www.railpage.org.au/railpix/