[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: (Vic, Melb) Maribyrnong Siding.



Each arriving train places the loads in position to unload (by the
contractor), and takes the empties!
their is room for a few vehicles to be left there, and I guess they are
delivering slightly faster than they are being unloaded
Rod [comtrain]

> Your last couple of postings all have the empty trains with one less wagon
> than the loaded trains. Does this mean each train leaves one wagon? Why?
> --

> Chris Stratton