Re: [NSW] Bondi Beach Rail - Under review



Given the current failure of the airport link that was privately funded
I doubt they will go ahead with that option.

I am also surprised at the comment about slow turnarounds. Even if they
could turn them quicker I don't think they would increase the number of
services down there anyway.

I think there are deeper reasons for this than time worries.

Verk


In article <u9fV5.48839$SF5.902506@ozemail.com.au>,
  "Chris Downs" <cvdowns@ozemail.com.au> wrote:
> From today's (Thu 30/11) The Sydney Morning Herald, page 4.
>
> "Stalled Bondi rail link back on the table.
>
> The stalled rail link to Bondi Beach may be scrapped in favour of a
> short rail loop under private funding options being assessed by the
> State Government.
>
> The NSW Treasury and the Rail Access Authority are completing an
> assessment of the two options.  The first is to continue with the rail
> extension with two tunnels.  The second is a government-funded loop
> at Bondi Junction that would enable a quicker train turnaround.
>
> The Minister for Transport, Mr Scully, was unwilling to set a
timetable
> for the release of an environmental impact statement.  He confirmed
> talks were under way and government funding may be required."
>
> Chris
>
>