[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Collision at Ararat



Aus loco discussion mailing list


>For the benefit of those not familiar with Ararat, I was wondering if
>someone could let us know:
>Safe working system (CTC, TO)?
Section Authority System
>Any signals?
One repeater for Pyreness loop near the down end points.
>Track circuits?
Not since standard-gauging
>Method of points operation?
Annett key kept in a locked box - not interlocked.
>
>Thank you
No probs.
Cheers

Kevin Lawrence


______________________________________________________________________
To unsubscribe, write to Ausloco-unsubscribe@listbot.com
______________________________________________________________________
Free Holiday Offer from MyFavoritiePC.com!
Get a Free PC with a 3-year subscription to the Microsoft Network. New PC features 400MHz Celeron, 32 MB, 4GB HDD, 40S CD, 3D graphics and 56K modem. Come to http://www.listbot.com/links/myfavoritepc for details. Act Now!