Went past there today and there is still a lot of
work to be done.
The main storage bin which I thought was finished
before Xmas is having the sides extended more, so is now about 30' high and
about 40' square and the stand is about 20' high
that the bin sits on.
There are numerous other sheds and small silos
around that have sprung up in the last couple of months.
I think it will be quite some time before it is
ready for train movements, maybe about six months.
Talking to the guys from Mossy box and they reckon
the longer it takes the better as Berrima Jnct. gets quite busy at times with up
to six trains or engines shunting.The locos on limestone and clinker work
are fuelling by road truck at the same time at the Junction and with only 4
roads plus the arrival rd it gets very busy.
On the south Danny