[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Inghams Feed Mill Berrima



Aus loco discussion mailing list

Went past there today and there is still a lot of work to be done.
The main storage bin which I thought was finished before Xmas is having the sides extended more, so is now about 30' high and about 40' square and the stand is about 20' high that the bin sits on.
There are numerous other sheds and small silos around that have sprung up in the last couple of months.
I think it will be quite some time before it is ready for train movements, maybe about six months.
Talking to the guys from Mossy box and they reckon the longer it takes the better as Berrima Jnct. gets quite busy at times with up to six trains or engines shunting.The locos on limestone and clinker work are fuelling by road truck at the same time at the Junction and with only 4 roads plus the arrival rd it gets very busy. 
On the south Danny

To unsubscribe, write to Ausloco-unsubscribe@listbot.com
Start Your Own FREE Email List at http://www.listbot.com